Parts used in different construction steps are often made through shaping, cutting, or joining raw materials in a controlled setting. This process supports consistent results across various project types.
With steady production methods, fabrication for construction industry Dubai continues to follow simple practices that match project demands and structural accuracy.
Basic process of fabrication
Fabrication begins with raw metal sheets, tubes, or bars. These are measured, cut, drilled, bent, or welded according to project drawings. The goal is to produce ready-to-install items that meet specific sizes and shapes. Unlike general manufacturing, which may create bulk products, fabrication is often focused on custom parts for a single project.
Tools and techniques used
Fabrication shops use a mix of machines and hand tools. These include press brakes for bending, CNC machines for cutting, and welding equipment for joining parts. Each tool supports a different part of the process. The equipment must match the type and thickness of the metal being prepared.
Types of metal used in fabrication
Steel, aluminium, and stainless steel are the most common choices in fabrication. Steel provides strength for structural parts. Aluminium is lighter and resists corrosion, making it suitable for panels or frames. Stainless steel is often used in areas where hygiene or durability is necessary, such as kitchens or hospitals.
Parts made through fabrication
Fabricated metal parts appear across all areas of construction. This includes beams, columns, staircases, railings, handrails, panels, frames, and covers. Some are structural, while others act as safety features or finishing elements. Each part is made to fit the building’s requirements and is usually delivered ready for installation.
Advantages of off-site preparation
By completing metalwork off-site, projects reduce the time necessary for adjustments during building. Pre-measured and assembled parts are delivered directly to the site. This supports faster work, cleaner conditions, and less disruption. It also reduces on-site waste and noise, especially in areas with limited access or tight timelines.
Fabrication and project coordination
To complete fabrication successfully, clear communication is necessary between the design team and the workshop. Early sharing of drawings and timelines helps align the fabrication with the site’s progress. Any changes must be shared quickly to avoid delays or rework.